What §14a Means for Your Charging Project
For German charging projects, §14a EnWG makes grid-responsive charging an important part of product selection and installation planning.
Check Whether Your Project Is Covered: The rules generally cover non-public charging points with a grid connection capacity above 4.2 kW, connected to the low-voltage network and commissioned from 1 January 2024. This can include charging at homes, workplaces and private fleet sites.
Understand Temporary Power Reduction: To manage local grid congestion, the network operator may temporarily limit electricity drawn from the grid. For a directly controlled wallbox, the minimum permitted power is generally 4.2 kW. This is a control limit, rather than a guarantee of actual charging speed.
Plan the Control Arrangement: Control can act directly on the charging point or through an energy management system (EMS). The charger’s control interface, external equipment and installation setup need to work together within the chosen arrangement.
For a closer look at the rules, read our guide to §14a EnWG and EV charging.


How BESEN Supports External Control
BESEN offers a customized dry-contact input for external charging control. This provides a way for compatible external control equipment to communicate a control request to the wallbox as part of a German §14a EnWG project.
A Defined Interface for External Control: A dry contact provides a switching signal to the charger. With the agreed configuration, the wallbox responds by adjusting its charging operation.
Configuration Matched to Your Project: The external control equipment, required charging response and selected charging functions are reviewed together to define a suitable configuration before ordering.
Available Across all Wallbox Models: Customization is available for BESEN wallboxes model.
Choose Your BESEN Wallbox
Explore seven BESEN AC wallbox models with different designs, functions and charging options. Select a model that fits your application, then discuss its external control setup and other planned functions with BESEN.
Plan Your Charging Functions Together
- Everyday Charging & Access
- Load Balancing & Solar Charging
- OCPP Connectivity & MID Metering
Choose basic charging for straightforward operation, app control for convenient charging management, or RFID access for authorized users. Your preferred user experience helps define the configuration.
Dynamic load balancing manages charging according to available site capacity, while solar charging uses available PV energy. If either is required, include it in the configuration review alongside external grid control.
OCPP connects compatible chargers to a charging management platform, while MID metering supports verifiable energy measurement. Specify your platform and metering needs when discussing the project.
Match the Charger to Your Project
Share your project requirements so BESEN can review the external control connection, installation needs and supporting documentation. You can start the discussion even if your model or control equipment has not yet been selected.




From Requirements to Delivery
Move your German charging project forward with a clear process for reviewing requirements, evaluating the proposed configuration and confirming order details.
- Review Your Requirements: Share your intended application, charging functions and external control requirements. BESEN reviews these details with you to identify a suitable model and define the customization scope.
- Evaluate the Configuration: Review the proposed charger configuration and discuss sample availability for evaluation with your installer or technical team. Confirm the expected control response and required function combination before proceeding with a bulk order.
- Confirm Order & Delivery: Finalize the agreed specifications, quantity, branding, documentation and supply scope. Sample terms, minimum order quantity and delivery timing are confirmed according to your customization requirements.
Do not assume that a standard wallbox version is suitable for a German §14a EnWG project. The model, control interface and charging response need to be reviewed for the planned installation before ordering.
Yes. Start with your intended application, preferred charging functions and any known installation requirements. Our team can help you shortlist a model and identify the details needed for configuration review.
That depends on the equipment interface and the planned control setup. Share the manufacturer, model and interface documentation with BESEN so the proposed connection and charging response can be assessed.
These functions can be discussed together during project planning. Availability differs by wallbox model and configuration, so BESEN will review the proposed function combination and external control setup before confirming a version.
You can request product specifications, installation information and relevant documents for the proposed configuration. Tell us what your purchasing team, installer or project partner requires so we can confirm document availability and any project-specific information needed.
These depend on the selected model, customization scope and order quantity. Share your expected volume and target delivery date to discuss sample availability, minimum order requirements and a suitable delivery schedule.